Maintenance
& Logistics Operations

Location

Damietta, Port

Owner

Connaught Shipmanagement (HK) Limited

Main Contractor

CLIPPER BAROLO

The project involved critical structural maintenance and refurbishment of a vital onboard component.

 

All activities were carried out in line with the requirements of Lloyd’s Register (LR) and under close coordination with certified marine surveyors.

 

  • Precision aluminum welding using certified MIG welding equipment.

  • Replacement of damaged metal sections with new plates matching international standards.

  • Load testing performed using a calibrated Load Cell, supervised by a class surveyor from LR.

  • Submission of full technical reports including calibration certificates and non-destructive testing (NDT) results.

  • Full logistical coordination within the port, including permit acquisition and crew access management.

 

Technical Team

The project was carried out by a qualified team comprising:

  • NDT engineers (Level II & Level III certified).

  • LR-certified aluminum welding specialist.

  • Skilled technicians for structural preparation and installation.

Outcome

The job was completed successfully and formally approved by the classification society. The restored component was returned to full operational condition, enhancing the vessel’s safety and readiness.

As part of our commitment to delivering integrated maintenance services and efficient logistical solutions, our team successfully completed a comprehensive project for Connaught Shipmanagement (HK) Limited at Damietta Port in March 2025.

“Your Pathway to Success”.